maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

Both Shays’s Rebellion and the Pennsylvania Mutiny helped Americans to realize that the Articles of Confederation...
Which personal pronoun correctly completes the sentence? What is its use? Because so many leaves had fallen, their parents helped __________ rake the yard. A. t
Which personal pronoun correctly completes the sentence? A flock of birds flew over __________. A. we B. his C. they D. them
who was responsible for the holocaust
Which is a symbol of deindustrialization? Energy crisis, Love Canal, Manufacturing Belt, Rust Belt, or Stagflation.
Does wind have atoms and molecules in it?
Gabriella weighs 450 N. She climbs a flight of stairs to a height of 3 m. It takes her 5 seconds. If she were to climb the flight of stairs again in the same am
Who was Henry II? A. the king who led the Normans in their conquest of England B. the king who established a new system of justice in England C. the king who le
The sum of three consecutive even numbers is 66. What is the smallest of these numbers
What does sectionalism mean in social studies?