A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

a person who studies word origins and meanings would most likely be a
factoring 12m^2n^2-8mn+1=
I = {1, 2} List all possible subsets of the given set.
What Canadian city is across a body of water from New York
I = {1, 2} List all possible subsets of the given set.
What Canadian city is across a body of water from New York
A 1700 kg 2006 Mustang GT can accelerate from rest to 100 km/h in a time of 5.0 s.  Determine the net amount of work that must be done on the car to cause this
I = {1, 2} List all possible subsets of the given set.
Given the inequalities y > 5x-8 and y >3x+4, find the point that satisfies one inequalities but not them all
Kim estimates that the faucet in her kitchen drips at a rate for 1 drop every 2 seconds. Erik wants to klnow how many times the faucet drips in a week.