omolayobeuty82 omolayobeuty82
  • 01-02-2021
  • Mathematics
contestada

it takes 8 labours 6days to complete a certain job.how many labours would complete the job in 15 days.​

Respuesta :

lakminirsenarath lakminirsenarath
  • 30-07-2021

Answer:

Step-by-step explanation:

Required man days to complete the job = 8 * 6

                                                                   = 48 Man Days

Required labors to complete the job by 15 days = 48/15

                                                                               = 3.2

It means, it is required 4 labors can complete the certain work by 15 days

Answer Link

Otras preguntas

how many cups is 10 qt
What tradition did the Bantu people bring with them throughout their migrations? farming hunting and gathering trading craftsmanship.
what is the percent of 1.6 hours to 0.95 hour
A ball is made of a plastic sphere covered with a layer of rubber. The plastic sphere has a radius of 18 in., and the ball itself has a radius of 22 in. What is
what is the land like in the south and southwest parts of asia
what is the principal square root of 36, why
which unit would be most appropriate for measuring the length of a barn?
is 1/2x=21 42 i need to be sure
Which economic term refers to the situation where one country can manufacture and export automobiles at a lower cost than its competitors? opportunity cost comp
Qin Shihuangdi was buried with over 6,000 soldiers and horses made of _____. A. Jewels. B. Terra- cotta. C. Gold or D. Bronze