raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

Earth is a close approximation of a natural closed system.  What are some ways that living in a closed system affects each of us.
State whether the following statements are true or false. Justify.(i) For an arbitrary binary operation * on a set N,  a * a = a ,  for all a * N.(ii) If * is a
Convert the general form of the circle given into standard form. 2x^2 + 2y^2 - 20x - 8y + 50 = 0
where does the shadow of the shuttle in space form?
where did japan first expand its empire after 1930
the graph below shows the distribution of students grades on their last math test. Based on the Empirical rule, what percent of students made.. *btwn 80 n 85 o
Multiply these fractions (Lowest Terms) a) 2 x 3/4 b) 3 x 3/5 c) 4 x 1/3 d) 6 x 2/5 e) 1/2 x 1/4 f) 4/5 x 2/3 g) 5/6 x 3/4 h ) 1/10 x 2/3 i) 2 1/5 x 1/
A curved section of roadway is in the shape of a circular arc of 410-m radius. The curved section is horizontal, not banked. The coefficient of friction for tir
find a common solution for each system of equations: y=3x+5 y=-5x-3
where will you find maximum rate of evaporation - ocean, pond or an aquarium? Give reason to support your answer.