  • Business
contestada

The project management plan can be composed of one or more of the __________ subsidiary plans a. Cost management b. Schedule management plan c. Project scope management plan d. All of the above

Respuesta :

lilmoma0311p4iph8
lilmoma0311p4iph8 lilmoma0311p4iph8
  • 03-03-2020

Answer:

cost management or schedule management plan

Answer Link

Otras preguntas

Find the angle of elevation of the sun when a 12.5 meter tall telephone pole casts an 18 meter long shadow.
According to karl marx, differences in wealth and power between the capitalists and proletarians leads to:
What Does This Mean ? Someone Please Help Me
Amy made $900 selling candy.She spent 4/9 of her money and saved the rest.hiw much money did she save?
How did August Ames die?
the length of a rectangle is 8 more than twice its width the perimeter is 96 feet find the dimensions of the rectangle
i really need help with this. please show me how you got the answer. thanks in advance:)
Dryland planting can benefit the environment by reducing the need for tillage. true or false?
who was the first official president of the republic of texas?
When using hexagonal writing to narrow a topic, which is not an angle from which to look at a piece of literature? theme introduction analysis plot